The prospect of a fully electrified railway network has long been an aspiration of the European rail community. There are clear benefits economically, environmentally and from a performance-based perspective. However, the percentage of electrified vs. non-electrified track varies significantly from country to country. Battery-powered trains have been proposed to address electrification gaps in networks, but until recently, their ability to complete journeys of over 100 miles ‘zero emission’ was rare.
This changed this year when, in the UK, Great Western Railway (GWR) completed a 200-mile journey with its modified Class 230 train on a single charge – without even using the full installed capacity – smashing the previous record of 139 miles and proving that battery powered trains can be a feasible solution for electrifying large sections of the European railway network.
This achievement follows the year-long trial by GWR on its West Ealing to Greenford line, in which a converted Class 230 equipped with flash-charging capabilities produced some impressive results. It achieved a total cost of ownership as low as £2.52 per train mile – far below the £4.50 of its diesel counterpart – and slashed carbon emissions by 80% compared to diesel equivalents.