In The Lost Art of Passenger Comfort & Good Design – Railway Interiors Part 1, …
Continue reading
In The Lost Art of Passenger Comfort & Good Design – Railway Interiors Part 1, …
Continue readingOn the 9th October, at Kings Cross, TfL unveiled the latest concept for the New Tube for London (NTfL) – the rolling stock design that will serve the majority of the “Deep Tube” lines, beginning …
Continue readingLong-time followers of Crossrail will be aware that for sometime the company has had webcams in place at a number of key construction sites. Over the years these have produced a number of interesting static …
Continue readingThe idea of extending the Bakerloo Line southwards is almost as old as the Bakerloo Line itself. One that seems to capture the imagination of rail enthusiasts, politicians and Londoners alike. It certainly ranks alongside …
Continue readingIn part 4 of our Study in Sussex we looked at the restrictions on capacity at Victoria Station and came only to the rather vague conclusion that there was probably more capacity available in future. …
Continue readingOn 22nd September TfL launched a new consultation on the possibility of adding one or more stations to the London Overground in west London at Old Oak Common. With at least two other OOC rail …
Continue readingIn our quest to look at capacity issues and opportunities in Sussex we come to part 5 and are still only as far south as Clapham Junction – and we still haven’t yet looked at …
Continue readingAs many readers will be aware, over recent weeks we have been taking an in-depth look at London 2050. Published in July by the Mayor and directed by Isabel Dedring and many GLA staff, TfL …
Continue readingIn part 2 of our detailed look at London 2050 we look at what it forecasts for both jobs and population – and how these affect the proposed transport strategy to be found within it.
Continue readingAt first sight, Battersea Park station appears to be a complete contradiction. It is not exactly pretty at platform level, but has a splendid façade and booking office. It has five platforms, but only one …
Continue readingThis August Bank Holiday sees the first major Thameslink Blockade at London Bridge. The low level platforms and the route in from the Southern lines (via New Cross Gate or South Bermondsey) will be blocked …
Continue readingWe like to think it is not often we get caught out at London Reconnections. Often there’s a hint, either spotter or official, if not an openly advanced warning, about significant announcements. Other times we …
Continue readingIn both science and science fiction, time warps are where there is a multi-dimensional fold in the space-time continuum which allow the traveller to pass from one space-time environment to another, as easily as stepping off an escalator at Kings Cross. The London Infrastructure Plan 2050 (‘London 2050’), published in July by the Mayor and directed by Isabel Dedring and many GLA staff, TfL and other colleagues, is an attempt to provide the London of today with a blueprint for such a transition to the London of tomorrow.
Continue readingThe Brighton Main Line (BML) from Victoria (and London Bridge) needs more capacity. This has been known for years but more recently it has been clear that demand has been accelerating and showing no indication …
Continue readingLondon’s railways south of the river are a popular topic here but one that can sometimes be confusing. As a result, we’ve decided to do something rather different this summer and offer a guided tour …
Continue readingWe wrote recently about how Crossrail would operate and now we know who – it was announced this morning that MTR have been selected as the successful bidder for the £1.4bn, eight year (extendable to …
Continue reading