Every depot operates differently, and each fleet of trains require different maintenance procedures. Every operator or maintainer faces great challenges when trying to introduce new fleets to the network and operating these trains with as little disruption as possible. Against this backdrop, find out more about the challenges of depot construction, how current depots have changed to accommodate new fleets and the input to new depot infrastructure, facilities and fleet design. This event aims to promote a wider industry view on the variety of solutions and projects being implemented to continue operating existing and upcoming fleets out of new depots safely and to a busy timetable.
The speakers are:
- Louis Yuen, Senior Depot Manager, Sui ho Wan Depot, MTR
- Marc Robson, Regional Fleet Manager, Stadler Rail Service UK Ltd.
- Jack Evans, Management Graduate – Engineering, Great Western Railway